Operations

Current Presentation
Corporate Overview
Winter Program 2009/2010

 

 EXCELLENT DRILL BIT DRIVEN PRODUCTION GROWTH POTENTIAL

 

       Quality property base and large prospect inventory — over 500 drilling locations

 

  • Light Oil and Stacked Resource Play
  • Over 148 sections - 500 Plus Well Inventory Over 3.8 tcf Resource Potential
    • Red Earth multi-year light oil prospect inventory
      • Solid light oil production base at Red Earth - excellent netbacks
    • Deep Basin multi-zone gas play - conventional and tight gas
      • Excellent high potential multi-zone gas prospects at Deep Basin
      • Conventional/traditional large reserve high rate
        • Plus large scale (stacked) tight gas resource play
      • Early and significant success in a scalable opportunity
        • Success in Elmworth, Red Rock plus significant land adds
      • Developed expanded land and opportunities in Deep Basin
        • Elmworth, Red Rock, Bilbo, Chinook Ridge, Jackpine
  • Large Land Base
 
Peace River
Red Earth + Misc
Total Acreage
Gross
117,000
79,000
196,000
Net
85,000
52,000
137,000

    

  • Red Earth — Working Interest: 25-100% (operated)
    Large exploration/development project High value - top quality light oil property. Extensive 3D seismic coverage, waterflood and waterhandling, reduced operating costs and excellent netbacks. Drilling Inventory 20-25 gross wells and developing Slave Point play expands inventory.

  • Deep Basin "Sweet Spot" Working Interest: 30-100% (operated)
    High potential area which Midnight is well positioned in. The balance is controlled by other major Oil and Gas companies. The Deep Basin is a Tight Gas Resource Play with large basin centred gas accumulation continually charged from Paddy/Cadotte to Nikanassin. Drilling Inventory 500+ locations with multi-well, multi-zone prospect inventory.


WINTER 2009/2010 PROGRAM
Area
Gross
Net
Winter/Capex $M
Elmworth
$6,000
     Drill & Complete Cadomin HZ
1
0.55
     Completions
1
0.55
     Compression
Red Rock/Bilbo
$5,000
     Drill & Complete Cadomin HZ
1
0.30
     Completions
3
0.90
     Facilities
Chinook Ridge
$9,000
     Drill & Complete Vertical Nikanassin
2
0.75
     Deepen/Re-enter
2
0.90
Base Budget
10
3.95
$20,000
Expanded Program
4
2.00
$10,000
Total Program
14

5.95

$30,000

HOME | CONTACT US |  LEGAL  | SITE MAP